New TPO, heat-welded at sunrise.
A new TPO membrane on a Twin Falls retail center, taken up and over every parapet.
Real roofs we've restored and replaced across Southern Idaho. Our own crew on every one, and one of the family on every job.

The old roof on this Boise office building was worn out and patched over. We added 2-inch polyiso foam board for insulation and installed a heat-welded Duro-Last TPO membrane, backed by Duro-Last's warranty.
A repeat customer: we re-roofed another building on the same property the year before.


The old roof was alligatored and cracked across the whole surface, and some sections were bare metal. We laid new insulation board and installed a heat-welded Duro-Last Duro-TECH TPO membrane, section by section, with our own crew starting at sunrise.




Metal roof restorations across the Ford Idaho Center campus, including the Ford Idaho Sports Center. We sealed the seams and fasteners and coated the existing metal with a Conklin roof coating system, so nothing had to be torn off.





We sprayed new foam over the whole roof and sealed it up around every duct and curb. Then came Conklin's Benchmark base coat and a bright white Puma topcoat.



Instead of tearing off the old single-ply roof, we restored it. Every seam and penetration got sealed in base coat first, walkway pads went down along the rooftop units, and then the whole roof and its parapet walls were coated bright white.



A Conklin metal roof restoration. Before the full coating goes on, our crew embeds reinforcing fabric over every seam in Conklin's Benchmark base coat. That's where metal roofs leak, so that's where we put the most work.
Restaurants need PVC: it stands up to grease from the kitchen exhaust. We prepped the old roof and the crumbling parapet walls, sheathed the walls in new plywood, and heat-welded a PVC membrane across the roof and up every wall.





Years of patches over a tired low-slope roof. We cleaned it, reinforced the seams and coated the whole surface, without tearing anything off and without closing the clinic for a day.



The old roof was worn out. We sprayed new foam over it, then sealed it with Conklin base and topcoats, working around the guests the whole way.




Instead of replacing a worn metal roof, we covered it in spray foam for insulation and a seamless surface, then sealed it with base and white topcoats.